Anburey illustration of blockhouse plan

Description
The blockhouse plan depicts labeled sections of the side view, ground floor, and upper story.

In collections

File details
ID Label Size Mimetype Created
OBJ BlockhousePlan1789_001 (1).tiff 34 MiB image/tiff 2016-07-19
TN Thumbnail 7.47 KiB image/jpeg 2016-07-19
JPG Medium sized JPEG 67.76 KiB image/jpeg 2016-07-19
JP2 JPEG 2000 1.91 MiB image/jp2 2016-07-19